Bid Solicitation: 00002996
Header Information
Bid Number: 00002996 Description: FORMAL -PROJECT 11: BAYPORT TO MORGANS POINT, HSC STA 16+000 TO HSC BAYOU STA 27+48.18 Bid Opening Date: 12/20/2023 11:00:00 AM
Purchaser: Alberto Foster Organization: Port of Houston Authority
Department: 76250 - 2021 Revenue Bond Construction Fund Location: 76250 - 2021 Revenue Bond Construction Fund
Fiscal Year: 23 Type Code: RP - RFP - Request For Proposal Allow Electronic Quote: No
Alternate Id:   Required Date: Available Date :  10/23/2023 04:39:43 PM
Info Contact: Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: A PRE-PROPOSAL CONFERENCE WILL BE HELD ON NOVEMBER 2, 2023 AT 11:30 A.M. VIA TEAMS. INSTRUCTIONS TO BE POSTED ON BUYSPEED.
Bulletin Desc: Project 11: Bayport to Morgan's Point HSC STA 15+500 to HSC STA -0+003.94 Dredging to accomplish widening of the HSC in Segment 1C with dredged material beneficially reused to create dikes for a new marsh cell and repair existing dikes in the Galveston Bay.
Ship-to Address: VICKI MIRANDA
111 EAST LOOP NORTH (exit 29)
HOUSTON, TX 77029
US
Email: [email protected]
Phone: (713)670-2818
Bill-to Address: Port of Houston Authority
P.O. Box 2562
Houston, TX 77252-2562
US
Email: [email protected]
Phone: (713)670-2400
Print Format: Bid Print
File Attachments: ADDENDUM NO. 3
ADDENDUM NO. 3 - FILE 1 of 5
ADDENDUM NO. 3 - FILE 2 of 5
ADDENDUM NO. 3 - FILE 3 of 5
ADDENDUM NO. 3 - FILE 4 of 5
ADDENDUM NO. 3 - FILE 5 of 5
ADDENDUM NO. 4
SIDE SCAN RAW DATA 2018 - Answer to Question No 120 - Files 1 of 4
SIDE SCAN RAW DATA 2018 - Answer to Question No 120 - Files 2 of 4
SIDE SCAN RAW DATA 2018 - Answer to Question No 120 - Files 3 of 4
SIDE SCAN RAW DATA 2018 - Answer to Question No 120 - Files 4 of 4
SIDE SCAN RAW DATA 2020 - Answer to Question No 120
ADDENDUM NO. 5
ADDENDUM NO. 6
TERMS AND CONDITIONS .pdf
PIPELINE COORDINATION REPORT
SOLICITATION PACKAGE
GENERAL CONDITIONS
SPECIAL CONDITIONS
TECHNICAL SPECIFICATIONS
TECHNICAL SPECIFICATIONS - APPENDIX A - SITE MAP
PLANS
PIPELINE SURVEY
PRE-PROPOSAL MEETING INSTRUCTIONS
ADDENDUM NO. 1
ADDENDUM NO. 1 - ITEM NO. 2 - FILE 1 of 3
ADDENDUM NO. 1 - ITEM NO. 2 - FILE 2 of 3
ADDENDUM NO. 1 - ITEM NO. 2 - FILE 3 of 3
ADDENDUM NO. 2
Form Attachments:
Legal Contract: Contract Required
Amendments:
Amendment # Amendment Date Amendment Note
1 10/27/2023 02:55:01 PM Administrative addendum to include Pre-proposal meeting invitation. No signed addendum acknowledgment required. Attachment File Changes: Header 1. File 'PRE-PROPOSAL MEETING INSTRUCTIONS': File 'PRE-PROPOSAL MEETING INSTRUCTIONS' added .
2 11/21/2023 05:14:29 PM Include the 1-page signed addendum acknowledgment with the emailed proposal response. Header 1. Bid Opening Date changed from "12/06/2023 11:00:00 AM" to "12/13/2023 11:00:00 AM". Attachment File Changes: Header 1. File 'ADDENDUM NO. 1': File 'ADDENDUM NO. 1' added . 2. File 'ADDENDUM NO. 1 - ITEM NO. 2 - FILE 1 of 3': File 'ADDENDUM NO. 1 - ITEM NO. 2 - FILE 1 of 3' added . 3. File 'ADDENDUM NO. 1 - ITEM NO. 2 - FILE 2 of 3': File 'ADDENDUM NO. 1 - ITEM NO. 2 - FILE 2 of 3' added . 4. File 'ADDENDUM NO. 1 - ITEM NO. 2 - FILE 3 of 3': File 'ADDENDUM NO. 1 - ITEM NO. 2 - FILE 3 of 3' added .
3 11/21/2023 05:23:37 PM Include the 2-page signed addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 2': File 'ADDENDUM NO. 2' added .
4 12/07/2023 12:48:16 PM Include the 2-page signed addendum acknowledgment with the emailed proposal response. Header 1. Bid Opening Date changed from "12/13/2023 11:00:00 AM" to "12/20/2023 11:00:00 AM". Attachment File Changes: Header 1. File 'ADDENDUM NO. 3': File 'ADDENDUM NO. 3' added . 2. File 'ADDENDUM NO. 3 - FILE 1 of 5': File 'ADDENDUM NO. 3 - FILE 1 of 5' added . 3. File 'ADDENDUM NO. 3 - FILE 2 of 5': File 'ADDENDUM NO. 3 - FILE 2 of 5' added . 4. File 'ADDENDUM NO. 3 - FILE 3 of 5': File 'ADDENDUM NO. 3 - FILE 3 of 5' added . 5. File 'ADDENDUM NO. 3 - FILE 4 of 5': File 'ADDENDUM NO. 3 - FILE 4 of 5' added . 6. File 'ADDENDUM NO. 3 - FILE 5 of 5': File 'ADDENDUM NO. 3 - FILE 5 of 5' added .
5 12/12/2023 06:06:20 PM Include the 2-page signed addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 4': File 'ADDENDUM NO. 4' added .
6 12/14/2023 03:24:34 PM Administrative addendum. No signed addendum acknowledgment required. In response to question 120 and coinciding with Addendum No. 3, side scan survey raw data for portions of the work, including along the Morgans Point shoreline, is available. Attachment File Changes: Header 1. File 'SIDE SCAN RAW DATA 2018 - Answer to Question No 120 - Files 1 of 4': File 'SIDE SCAN RAW DATA 2018 - Answer to Question No 120 - Files 1 of 4' added . 2. File 'SIDE SCAN RAW DATA 2018 - Answer to Question No 120 - Files 2 of 4': File 'SIDE SCAN RAW DATA 2018 - Answer to Question No 120 - Files 2 of 4' added . 3. File 'SIDE SCAN RAW DATA 2018 - Answer to Question No 120 - Files 3 of 4': File 'SIDE SCAN RAW DATA 2018 - Answer to Question No 120 - Files 3 of 4' added . 4. File 'SIDE SCAN RAW DATA 2018 - Answer to Question No 120 - Files 4 of 4': File 'SIDE SCAN RAW DATA 2018 - Answer to Question No 120 - Files 4 of 4' added . 5. File 'SIDE SCAN RAW DATA 2020 - Answer to Question No 120': File 'SIDE SCAN RAW DATA 2020 - Answer to Question No 120' added .
7 12/15/2023 06:21:04 PM Include the 1-page signed addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 5': File 'ADDENDUM NO. 5' added .
8 12/18/2023 12:00:10 PM Include the 1-page signed addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 6': File 'ADDENDUM NO. 6' added .
Item Information
1-5 of 6
1 2 
Item # 1:   ( 925  -  44 )   FORMAL-FURNISH ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, SUPPLIES, SUPERINTENDENCE, INSURANCE, INCIDENTALS, AND ALL OTHER THINGS NECESSARY TO PERFORM SERVICES FOR [ENTER PROJECT NAME] ALL IN ACCORDANCE WITH CONTRACT DATED [ENTER CONTRACT DATE]. ALL INVOICES AND CORRESPONDENCE SHALL BE ADDRESSED TO THE ATTENTION OF [ENTER CONTACT'S NAME]. A CERTIFICATE OF INSURANCE MUST BE PROVIDED PRIOR TO COMMENCEMENT OF ANY WORK. THE PORT AUTHORITY MAY AT ITS OPTION, CANCEL THIS PURCHASE ORDER AT ANY TIME AND PAY THE CONSULTANT FOR ACTUAL SERVICES PERFORMED BASED ON THE WORK PERFORMED UP UNTIL RECEIPT OF SUCH WRITTEN NOTICE.
NIGP Code: 925-44
   General Construction: Management, Scheduling, Cost Estimation Engineering
Qty Unit Cost UOM Tax Rate Tax Amount Total Cost
1.0   EA - Each        
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 958  -  26 )   SUBSEQUENT NIGP CODE ADDED
NIGP Code: 958-26
   Construction Management Services
Qty Unit Cost UOM Tax Rate Tax Amount Total Cost
1.0   EA - Each        
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 959  -  00 )   SUBSEQUENT NIGP CODE ADDED
NIGP Code: 959-00
   MARINE CONSTRUCTION AND RELATED SERVICES; MARINE EQUIPMENT MAINTENANCE AND REPAIR
Qty Unit Cost UOM Tax Rate Tax Amount Total Cost
1.0   EA - Each        
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 4:   ( 959  -  34 )   SUBSEQUENT NIGP CODE ADDED
NIGP Code: 959-34
   Construction Services: Boats, Barges, Ferries, Ships, etc.
Qty Unit Cost UOM Tax Rate Tax Amount Total Cost
1.0   EA - Each        
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 5:   ( 959  -  35 )   SUBSEQUENT NIGP CODE ADDED
NIGP Code: 959-35
   Construction Services, General Marine
Qty Unit Cost UOM Tax Rate Tax Amount Total Cost
1.0   EA - Each        
Manufacturer: Brand: Model:
Make: Packaging:
 
1-5 of 6
1 2 
default